Serving Los Angeles, Glendale, Pasadena, Burbank, Santa Monica, Culver City & nearby citiesCall (213) 377-6198
Demolition Contractors in Los Angeles, CA

Teardowns down to the dirt

House Demolition in Los Angeles, CA

Permit, asbestos survey, utility disconnects, teardown, foundation removal and a clean pad for whatever you build next.

  • Free walk-through and written, itemized estimate
  • Asbestos survey, air district notice and utility cut-offs sequenced before demolition
  • Concrete, metal and wood separated for recycling

Taking a House Down the Right Way

House demolition in Los Angeles is mostly paperwork and preparation, and only partly machinery. A crew with an excavator can bring down a one-story bungalow in a day. Getting to that day means an asbestos survey, notice to the air district, gas, power and water shut off at the source, a sewer cap, and a demolition permit from the Los Angeles Department of Building and Safety (LADBS). We handle that sequence for owners, builders and architects who need a lot cleared for a rebuild, an ADU project, a lot split or a sale.

Who calls us for a teardown

  • Owners rebuilding on the same lot, often after years of planning or a damaging event
  • Buyers who purchased a property for the land and plan a new house
  • Builders and architects who need the site clear before grading and foundations
  • Families settling an estate where the existing house is beyond repair
  • Owners told by an inspector that a structure is unsafe

If you are not sure whether a remodel or a teardown makes more sense, we can walk the property with you and price the demolition side so your designer or builder has a real number.

What happens before the first wall comes down

Inside the city of Los Angeles, the steps are set out in LADBS Information Bulletin P/BC 2026-039, Demolition of Buildings, revised January 1, 2026:

  • A permit for each building. A separate demolition permit is needed for each building or structure on the lot, and it states the demolition method. It is issued to a licensed wrecking (C-21) or Class A general engineering contractor.
  • A pre-inspection. A Building Inspector visits the site before the permit is issued.
  • A sewer cap. If the house has a sewer line, a sewer cap permit is required before the demolition permit, and the cap is inspected before it is covered.
  • The 45-year rule. For buildings 45 years or older, LADBS mails notice to abutting owners and occupants, the Council District office and the Neighborhood Council, and the permit cannot be issued until at least 30 days after that notice.
  • A notice on site. A placard reading NOTICE OF DEMOLITION, at least 11 by 17 inches, goes up within 5 feet of the front property line.
  • Protection and clearances. Protection fences are inspected before work begins. Protected trees need clearance from the Urban Forestry Division, and lots in a Historic Preservation Overlay Zone may need HPOZ clearance.

Separately, South Coast AQMD Rule 1403 calls for an asbestos survey by a Cal/OSHA certified inspector and notice to the air district no later than 10 working days before demolition begins. Gas and electric service are shut off by the utilities at the meter. We line these steps up in the right order so one late item does not hold up the start date.

Foundations, slabs and what stays

A teardown is not finished when the frame is in the bin. Raised-floor homes have perimeter footings, piers and sometimes a basement or cellar. Slab homes have the slab, its footings and any buried plumbing. Your project decides how much comes out:

  • Full removal for a new house with a new foundation design
  • Partial removal when an engineer wants to reuse a section of footing or a retaining wall
  • Leave in place for items you want kept: a block wall on the property line, a mature tree, a driveway apron

We mark what stays before work starts and protect it during the job. Trees that the city or your plans protect get fencing, and we keep equipment off their root zones.

Debris, dust and neighbors

A typical house produces many truckloads of wood, stucco, drywall, roofing, concrete and metal. Inside city limits, the Citywide Construction and Demolition Waste Recycling Ordinance (No. 181519) requires mixed construction and demolition debris to be hauled only to City-certified processing facilities, and LA Sanitation says penalties can reach $5,000 for each load taken elsewhere. We haul to certified facilities and keep concrete and metal separate where we can, since both are recycled. On site we keep dust down with water, keep the street and sidewalk swept, and stage trucks so driveways next door stay open. On hillside streets with tight turns, we plan the size of the trucks and containers before mobilizing.

Get a Free Estimate

What the finished site looks like

When we leave, the building, its foundation (unless you asked us to keep it), buried debris and loose fill are gone, the utility points are capped and marked, and the lot is rough-graded so it drains and is ready for a survey. You get photos of the cleared site and copies of the permit sign-offs for your records and your next contractor. Call (213) 377-6198 to set up a walk-through.

What a House Teardown Includes

Every line below shows up on the written estimate, so you can see where the money goes.

Permit and notices

Demolition permit application with LADBS and the air district notice that has to be filed before work.

Asbestos and lead check

A survey by a certified inspector, with any abatement completed before the structure is taken down.

Utility disconnects

Coordination of gas and electric shut-off, water meter work and the sewer cap.

Structure removal

Roof, framing, walls and interior taken down with an excavator and hand crews.

Foundation and slab

Footings, piers, slab and buried debris broken out and hauled, or kept where your plans call for it.

Haul-off and recycling

Concrete, metal and wood separated where possible and taken to permitted facilities.

Rough grade

The pad left level and draining, ready for a surveyor and your builder.

Pool Removal in Los Angeles, CA

Typical House Demolition Costs

JobTypical range
Whole house, per sq ft$4 to $17
Typical house, total$6,000 to $25,000
1,200 sq ft house$4,800 to $20,400
1,500 sq ft house$6,000 to $25,500
2,000 sq ft house$8,000 to $34,000
Foundation removal$1,000 to $5,000
Asbestos removal (average)About $2,000
Permit$100 to $500

Figures from HomeAdvisor's house demolition cost guide (national averages). Los Angeles labor, disposal and permit costs often run higher, and asbestos, hillside access and foundation depth all move the total. Your written estimate is the price.

How a Teardown Runs

1. Walk-through

We look at the house, the lot, access, trees and neighbors, and note anything that needs special handling.

2. Survey and permits

Asbestos survey, air district notice, utility cut-offs, sewer cap and the LADBS demolition permit.

3. Demolition

Abatement first if needed, then the structure, then the foundation, with water for dust control.

4. Haul and grade

Debris sorted and hauled, the lot rough-graded, and final sign-off on the permit.

Concrete Removal in Los Angeles, CA

Why Choose Us for House Demolition

Paperwork in order

Survey, notices, disconnects and permit are sequenced so the start date holds.

Clear scope

The estimate states what comes out, what stays and how deep the foundation work goes.

House Demolition Questions

Do I need a permit to demolish a house in Los Angeles?

Yes. LADBS issues demolition permits for buildings in the city, and the permit is not issued until the air district notice and utility disconnects are taken care of. For buildings 45 years or older, LADBS mails notice to neighbors, the Council District office and the Neighborhood Council, and must wait at least 30 days after that notice before issuing the permit. Cities such as Glendale, Pasadena and Santa Monica run their own building departments with their own rules.

How long does a house demolition take?

The physical teardown of a typical single-family house usually takes a few days to about two weeks, depending on size, foundation type and access. The permit, asbestos survey and utility cut-offs often take longer than the demolition itself, so plan for several weeks of lead time.

Is an asbestos survey really required for a house?

For a demolition, yes. South Coast AQMD Rule 1403 requires a survey by a Cal/OSHA certified inspector and notice to the air district at least 10 working days before work begins. The exemptions for single-unit homes cover small renovations, not teardowns. About 70 percent of Los Angeles housing was built before 1980, per Census figures summarized by Point2Homes, so asbestos in flooring, ceilings, stucco or pipe wrap is a real possibility.

Will you remove the foundation and slab?

Usually yes, because most new homes need a new foundation design. If your engineer wants to keep part of a footing or a retaining wall, we leave it in place and protect it. The estimate spells out which one you are getting.

Can I stay in the house until demolition starts?

Yes, up to the point where utilities are shut off. Once gas and power are disconnected and the sewer is capped, the house cannot be lived in, so we schedule those steps with your move-out date in mind.

Interior Demolition in Los Angeles, CA

Get a House Demolition Estimate

We walk the lot, look at the permit path and give you a written teardown price.

Call Now: (213) 377-6198